Progress Q4 and Proposed List of Finishes Q1

Now the update: All changes and additions colored.

Proposed List of Finishes | mell-meyer

Details:
1. Aviatrix Medallion
Q2: Finished the blocks for the third border.
Q3: Second border pieced and connected. And I made an appointment for quilting on a Longarm. Deadline is now the 13. of December.
Q4: Finished the top AND quilted it on the longarm. Now I have to bury the threads and bind it. And figure out a hanging option/ sleeve. Click here for the blogpost.

2. Modern Four Patch
Supposed to become something different, I have now decided to change this unwanted project into a baby or toddler quilt. At the moment without an individual in mind – maybe to be a charity quilt. At the moment I have a lot of four patch blocks in kona cotton solids and because I wanted to try out the disappearing nine patch pattern.
Q3: Changed my mind from disappearing four patch to a modern four patch like this idea. I didn’t like the proportions whilst simulation a disappearing four patch. Started the cutting for the smaller four patches.

Q4: Unfortunately no progress.

3. “From Outside Inn”
The top for “From Outside Inn” is finished. The problem here is to find a background and binding fabric. As with No. 2 there is no specific recipient. I am still determined to use something from my “huge” stash as it is probably to become a charity quilt as well. #still-too-picky #undecided

Q4: Unfortunately no progress.

4. Bee blocks for September/ October
For motivational purposes I am adding my bee blocks for September/ October to the list – even though they will not qualify for an official “Finish!” later :)
My finish for Q4: They have been finished! #YEAH Click here for the blogpost.

NEW: Bee blocks for January/ February

5. Drunkards Path No. 2
Those two quilts have once been pieced for a bigger quilting idea, but I don’t like them enough anymore to continue this. So I am rather going to arrange them in two baby quilts then being unfished and unwanted in my home. The first one is already finished. Click here for the blogpost.

The quilt No. 2 is now quilted. The binding yet to be finished.

6. Technocolorgalaxy (Skill Builder BOM)
Q3: I have quilted some of my previous blocks and I did as well work on some more blocks. But the backlog is still huge.

Q4: Unfortunately no progress.

NEW: 7. Babyquilt for a dear friend
This quilt is really new in the making. We are still debating fabric and pattern.

NEW: 8. Rainbow Mini Swap Round 2
Still bumping around ideas and color combinations. I have already tried some but I am not sure about the final concept yet. The progress pictures will probably be on instagram till it’s received and I can write a real post. :)

This one is due 29th of February. So definitely a project for this quarter.

Conclusion:
So I am now running eight projects. Even if the list is growing, I feel like I am getting more productive. Let’s hope this will keep me further on track. :)

Linking up at Finish Along 2016 @ She Can Quilt.

5 Comments

  1. Pingback: #RainbowMiniSwapR2 – My Experience

  2. Pingback: Charity Quilts No. 2 + 3

  3. Pingback: Charity Quilt “Round No. 2”

  4. Pingback: Charity Quilt “From Outside In”

Share Your Thoughts

I love to hear from you! I read and appreciate all your comments and will respond to you via email, a comment here or by visiting your blog. Or a combination of the above. So thank you for leaving an awesome comment!

Shopping Cart
Scroll to Top